topN°IMPACT

    IMPACT on going (Creator : Valérie) .web

topShort-circuit tests

  • Planning .xls (Read Only)
  • R2E-LHC600A used for Energy Extraction tests in odd points .txt

topDC Cable Disconnection

  • Description: Disconnection of the DC cables for ELQA team, 13kA Energy Extraction System HV tests, water-cooled cable hose replacement, LHC600A-10V rack dismantling (R2E project)
  • Procedure .edms
  • Planning & Status .xlsx (Read Only)

topLHC60A Frame Move

  • Description: Move of LHC60A frames for Dipole magnet exchange
  • Procedure .edms

topLHC600A-10V Module Consolidation

topR2E-LHC600A Installation

  • Description: R2E-LHC600A Converter Installation
  • Procedures: Rack Integration in SR2 .edms, Rack Installation .edms, Module Installation .edms
  • Status .xls (Read Only)

topUseful Links

  • Plan Installation
  • Layout Database (Old)
  • List of Change during LS2 .xlsx (Read Only)
  • Plannings .web
  • Constraint Schedule .web
    • Point 2
      • Accès et évacuation personnels par PX24 du 02 juin 2020 au 10 août 2020 (Maintenance Ascenseur PM25)
      • Voir l'équipe transport pour descendre du matériel dans le tunnel LHC
      • Détails .edms
  • LHC Coordination Hot Line info 16 16 69