N°IMPACT
IMPACT on going (Creator : Valérie) .web
Short-circuit tests
- Planning .xls (Read Only)
- R2E-LHC600A used for Energy Extraction tests in odd points .txt
DC Cable Disconnection
- Description: Disconnection of the DC cables for ELQA team, 13kA Energy Extraction System HV tests, water-cooled cable hose replacement, LHC600A-10V rack dismantling (R2E project)
- Procedure .edms
- Planning & Status .xlsx (Read Only)
LHC60A Frame Move
- Description: Move of LHC60A frames for Dipole magnet exchange
- Procedure .edms
LHC600A-10V Module Consolidation
R2E-LHC600A Installation
- Description: R2E-LHC600A Converter Installation
- Procedures: Rack Integration in SR2 .edms,
Rack Installation .edms,
Module Installation .edms
- Status .xls (Read Only)
Useful Links
- Plan Installation
- Layout Database (Old)
- List of Change during LS2 .xlsx (Read Only)
- Plannings .web
- Constraint Schedule .web
- Point 2
- Accès et évacuation personnels par PX24 du 02 juin 2020 au 10 août 2020 (Maintenance Ascenseur PM25)
- Voir l'équipe transport pour descendre du matériel dans le tunnel LHC
- Détails .edms
- LHC Coordination Hot Line 16 16 69
|